Petrofac is seeking a Senior Instrument Designer - Contractor for 12 months based in Aberdeen, UK.
The role is outside IR35 and we invite Limited Companies to engage.
Scope Of Services
Provide design input to estimates for project work scopes
Provide technical design expertise to specify modifications to existing equipment or purchasing new equipment including:
DCS, ESD F&G and Metering system modifications
Field Instrumentation including Pressure, Level, Temperature, Flow and Specialist Measurements.
Valves
SIL, High Integrity Systems (HIPPS)
Measurement and Metering
Industrial Networking and Communications
Provide technical design expertise to the resolution of technical queries ensuring that all design changes are captured by the change control process
To be able to conduct site surveys on offshore or onshore assets
To be able to produce calculations required for the role and participate in design reviews.
Production of discipline documentation deliverables for inclusion in work packs.
Provide a level of technical support that satisfies the appropriate Asset Safety Case and that the PFEER performance standards ensuring they are not compromised by any discipline engineering activities
Compliance with company engineering procedures, industry, international and client codes and standards.
Ensure that all work complies with the Contract Health, Safety, Environmental and Quality policies and procedures as appropriate.
Deliverables
Block Diagrams or Single line diagrams
Cause & Effect Diagrams
Instrument Cable Block Diagram
Cable Tray Routing & Layout Diagrams
Panel; Control Room; F&G and Equipment Room Layouts
Panel Wiring Diagram
Destruct Drawing
Instrument Mounting / Support Details
Logic & Loop Diagrams
Schematic Diagrams
Cable Interconnection Diagrams
Cable; Panel & Junction box Termination Diagram
Junction Box Termination Diagram
Pneumatic; Chemical and Hydraulic Hook-up Diagram
Pneumatic; Chemical and Hydraulic Hook-up Schematic
Installation or story board diagrams to facilitate understanding
Cable Schedule
Requisition - Bulk Bill of Materials